Serenity BDD TodoMVC
Home
>
Pageobjects
>
Maintain my todo list
>
Clear completed todos
> Should not be able to clear completed todos if none are complete with page objects
Overall Test Results
Requirements
Themes
Capabilities
Features
Report generated 23-05-2024 08:43
Clear Completed Todos
Page Objects
1 To 10 Seconds (Duration)
Should not be able to clear completed todos if none are complete with page objects
Steps
Outcome
Starts with a todo list containing: {Walk the dog,Put out the garbage}
SUCCESS
2s 596ms
Adds todo items called: {Walk the dog,Put out the garbage}
SUCCESS
805ms
Adds a todo item called: Walk the dog
SUCCESS
588ms
Adds a todo item called: Put out the garbage
SUCCESS
208ms
Should see that the clear completed items option is not visible
SUCCESS
2s 032ms
SUCCESS
4.64s
Serenity BDD version 4.1.12